CPS/v0.5
Untitled Project

Dashboard

Project overview and module status

Evacuation

Zones
0
evac areas
Total Occupancy
0
persons
Resilience Cap.
0
worst-case
Evac Status
no data

Ingress

Lane Plan Total
physical lanes
Active Entry Points
gates
Achievable Ingress
of in-scope pax
Ingress Status
not calculated
Project Details
Project Name
Client
Venue / Site
Event Date
Notes
🚪
Evacuation Calculator
HSG195 / Green Guide compliant egress capacity with resilience testing and zone-level warnings.
Live
Ingress Planner
Demand-driven and gap-constrained ingress modelling, lane allocation, staffing, and gap fit check.
Live
📊
Crowd Density Analysis
Holding capacity, density mapping and vfdb TB 13-01 threshold monitoring by zone.
Coming Soon

Project Setup

Project details are shared across all modules

Project name is required.
Saved ✓
Egress / Evacuation Calculator
Target Evac min
Load template
Zones
0
areas defined
Total Exits
0
egress routes
Total Occupancy
0
persons to evacuate
Resilience Cap.
0
worst-case (−largest unit)
Overall Status
no zones
Flow Rate Reference & Standards (editable)
HSG195 Purple Guide  |  SGSA Green Guide  |  ANSI ES1.9-2020  |  vfdb TB 13-01
DEMAND-DRIVEN
Perimeter Ingress Model v4.1
Planning Mode
DEMAND-DRIVEN
GAP-CONSTRAINED
Lane plan calculated from demand. Required = ⌈target pax ÷ lane capacity⌉. Optional override to plan a different total.
lanes
Event Parameters
pax
%
Excluded Ticket Categories
Total excluded pax
Lane Configuration
pax/min
: 1
0–1
lanes
0–1
m
Key Outputs
Total excluded attendeespax
Included attendees (in scope)pax
Minutes availablemin
Target scannedpax
Lane capacity in windowpax/lane
PRIMARY lanes requiredlanes
EXCEPTIONS lanes requiredlanes
Active entry pointscount
ACCESSIBLE lanes reserved (min)lanes
TOTAL physical lanes REQUIREDlanes
Physical lanes AVAILABLE (gap slots)lanes
LANE PLAN total physical laneslanes
LANE PLAN primary laneslanes
Effective throughput laneslanes
Achievable scanned (lane plan)pax
Achievable % scanned%
Indicators
Configure Entry Points
Active weights total

Weights must add to 100%. Use Auto-normalise to fix automatically. Width optional — Gap Fit only.

Allocation Summary
Configure Ticket Categories
Category Breakdown
Station Ratios
Stations per Entry Point
Headcount by Role

Edit multipliers to account for combined roles.

Station Totals
Total Headcount
Total Perimeter Ingress Staff
persons
Gap Fit Check (Diagnostic)

Slots = floor(Width ÷ Module). Surplus = Slots − Allocated. Enter widths in Entry Points tab.

Gap Fit Summary

Report & Export Hub

Configure report settings, preview section summaries, and export in your preferred format

Export

PDF exports use jsPDF — no server required. Pop-ups must be permitted for downloads.

Report Settings
Include Sections in Full Report PDF
Project Summary
Evacuation Summary
Ingress Summary
Built by Daniel Noake | LinkedIn
BUY ME A COFFEE